The Energy Detective Forums
February 20, 2018, 10:46:21 AM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News: New TED Support forum launched!!
 
   Home   Help Search Login Register  
Pages: [1]
  Print  
Author Topic: going solar
toptek
Newbie
*
Posts: 2


« on: February 16, 2018, 01:30:07 PM »

Going solar I was approved today for solar and was told it may take up to four month to be turned on an in about two to three weeks it will be installed

I have the Ted pro home do i need to buy a completely new package or just a few things for solar ? .
I would like to keep using the TED if i can with solar, i love it .


Harry
Logged
pfletch101
Sr. Member
****
Posts: 405


WWW
« Reply #1 on: February 16, 2018, 08:33:03 PM »

You should be able to add anything you need - probably just another main MTU/CT set for the solar feeds - but how easy installation will be depends on how your new PV system connects to your breaker panels and/or to the mains. If to your main panel, with a single bidirectional meter and Net Metering, you should have no trouble at all; if directly to the utility mains via a separate second meter ("Feed-in Tariff"), how straightforward it will be to hook things up depends on the details of the physical layout.
Logged

Peter R. Fletcher
TED Pro Home - main MTUs monitoring utility and PV Solar feeds; 2 Spyders monitoring selected individual circuits
toptek
Newbie
*
Posts: 2


« Reply #2 on: February 17, 2018, 05:37:26 AM »

cool thanks i was told Net Metering ...
Logged
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.16 | SMF © 2011, Simple Machines Valid XHTML 1.0! Valid CSS!